Case Study & Solutions

Project Profile & Case Studies

Power Lines Electric Wires with Blue Sky

Wet Compression Boosts Power Output by 28 MW

Project Profile: MeeFog’s wet compression systems enhances power output by 28 MW for two GE 7F.03 turbines, achieving exceptional results without blade erosion after four summer seasons.

Workers are assembling industrial equipment with visible machinery, piping, and safety gear in a power facility.

Maximizing Power Output with MeeFog Systems at Tuxpan Power Plant, Mexico

Case Study: How the Tuxpan Power Plant in Mexico leveraged MeeFog Wet Compression to enhance gas turbine efficiency, significantly increasing power output while maintaining turbine integrity and reducing operational costs.

 

Exterior of Meta Platforms, Inc. data center in Prineville, Oregon during sunset for Meefog data center cooling

Facebook Upgrades Outside Air Cooling System at Prineville Data Center

Case Study: Following the success of the MeeFog data center cooling system installation in 2011, we partnered with Facebook to further enhance efficiency and reduce maintenance.

 

An industrial setup featuring APR Energy equipment, including a wooden enclosure with machinery and large cooling units in the background.

MeeFog Boosts Power Output by 15% at Sahara Power Station | APR Energy Case Study

Case Study: How MeeFog improved gas turbine cooling efficiency in extreme heat for General Electric Company of Libya (GECOL) —15% power boost with half the water usage

White water tank on a metal frame marked "MeeFog Systems," with blue hoses and mechanical components visible in the setup.

Grower Saves Countless Hours With the Mobile-Mee 20 Gallon

Project Profile: How the Mobile-Mee 20 Gallon transformed indoor IPM for Nutraleaf

Exterior of offshore gas re-injection well in the Persian Gulf using meefog inlet air cooling system installed on Rolls Royce RB211G gas turbine

Instant 1 MW Power Boost for Offshore Gas Re-Injection Well

Project Profile: A strategic upgrade on a Rolls Royce RB211 marine gas turbine resulted in a substantial power boost, leading to enhanced productivity even in extreme heat.

 

Exterior of Watson Cogeneration Plant (WCP) during sunset

Watson Cogeneration Boosts Output by 10 MW with MeeFog Wet Compression System

Case Study: Learn how Watson Cogeneration increased power production by 10 MW using MeeFog’s advanced wet compression technology, enhancing efficiency while reducing NOx emissions by 7 ppm.

 

Power Boost by Meefog Fog Systems

Vietnam’s Largest Power Plant Gains 60 MWs with MeeFog Cooling System

Project Profile: Learn about the custom-engineered solution that enhances gas turbine performance under extreme conditions.

Energy Efficient MeeFog System Allows Amherst College to Humidify the New Science Center

Massachusetts College Enhances AHU Performance with MeeFog Humidification and Evaporative Cooling

Project Profile: Learn about our custom pump rack solution with dual pumps and automated controls for optimized performance.