Case Study & Solutions

Project Profile & Case Studies

Modern brick office building with large windows, featuring the Alliant Energy logo, against a clear blue sky.

Energy Corp Becomes Energy Efficient with MeeFog System

Case Study: Originally, Alliant Energy headquarters was conditioned by seven air handlers using electric steam humidifiers. After choosing to go green, Alliant switched to MeeFog.

Oil Refinery Increases Output with Inlet Air Cooling

How a Southern California Refinery Mastered Power Generation and Cooling with MeeFog Technology

Case Study: Discover how we efficiently increased power generation while adhering to strict emissions regulations at a major oil refinery in the Los Angeles area.

MeeFog Adds 64MW of Power Augmentation to Mexican Power Plant

MeeFog Adds 64MW of Power Augmentation to Mexican Power Plant

Case Study: To capitalize on new market opportunities arising from energy regulations in Mexico, the Tuxpan III & IV Combined Cycle Power Plant aimed to maximize its power output.

 

Industrial setup after update

Las Vegas Cogen Slashes Cooling Costs and Boosts Output by 5 MW with MeeFog Technology

Case Study: In response to challenges posed by Las Vegas Nevada’s hot and dry climate, a GE LM6000-based peaker plant faces difficulties in maintaining optimal cooling during peak summer temperatures.

A close-up of a pressure gauge on a pipeline, with industrial valves and pipes in the background against a clear blue sky.

MeeFog System Enhances Power, Cuts Fuel Usage, and Reduces Emissions at Chinese Compressor Station

Case Study: Installing a MeeFog system on a GE LM2500 turbocompressor helped PetroChina enhance natural gas output, meet demand, and reduce emissions. Here’s how.

Silhouetted power lines and towers reflect in water as the sun rises, casting a vibrant orange and blue glow across the sky.

Boost of 28 MW on two Siemens SGT-5000FD2 GTs Using Wet Compression

Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of Durango, Mexico.

Industrial facility with machinery under a canopy, a ladder propped against it, and piping structures on gravel ground.

32 MW Power Boost On a Siemens Westinghouse W501FC

Project Profile: A power station in Mexico installed two MeeFog systems on a Siemens Westinghouse W501FC gas turbine.

Two workers in hard hats observe a large electricity substation with metal structures and power lines against a cloudy sky.

Inlet Cooling & Wet Compression Boosts Gas Turbine by 20 MW

Project Profile: MeeFog systems were installed in 2000 on two Siemans V64.3 gas turbines offering both inlet cooling and wet compression.

Evaporative Cooling & Wet Compression Boosts Power Output by 30 MW

Evaporative Cooling & Wet Compression Boosts Power Output by 30 MW

Project Profile: A Vietnamese power company needed a cost-effective way to boost output at their facility.