Kentucky College Installs MeeFog Humidification, Exhaust Cooling Systems and Water Treatment

Project Profile: Humidification for 4 Air Handlers and evaporative cooling for 4 Exhaust Units. This system is...

Energy Efficient MeeFog System Allows Amherst College to Humidify the New Science Center

Case Study: Humidification for AHU’s 1-4 & 6. Evaporative cooling for HRU’s 1-4. Consisting of one pump...
Iowa State University's Hach Hall

Iowa State University Builds the First Gold LEED Certified Chemistry Laboratory

Case Study: In 2011, ISU’s Hach Hall became the first chemistry building in the country to achieve...

Our Solution: Steam Condenser Pre-cooling

Case Study: A combined cycle power plant uses exhaust heat to make steam, the steam is run...

AC Condenser Pre-Cooling System Provides 16-Month Return on Investment

Project Profile: A circuit board manufacturer in Mexico installed pre-cooling on two York condensers.

Gas Turbine Inlet Air Fogging on Two SW 501FD2 GTs

Project Profile: A Southwestern US Power Station installed MeeFog Systems on two SW 501FD2 gas turbines.
Aerial daytime view of a gas‑fired power station with four cooling towers venting steam, cylindrical storage tanks in the foreground, and beige turbine‑generator buildings, pipes, and electrical switchyard equipment filling the complex.

Adding Wet Compression to Existing Fog System Eagle Point Power Generation – Westville, NJ

Case Study: Eagle Point Power Generation (EPPG) in Westville, NJ is a 225 MW combined-cycle facility with...

MeeFog System Rapid ROI Pays for Additional Cooling Power

Case Study: Midland Cogeneration Venture needed a cost-effective way to boost output at their facility. Mee Industries...

Grand River Hospital Gains a Chemical-Free Humidification Solution

Blog: Fog uses clean water from an RO system and saves energy compared to direct steam injection.