Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

Heat Exchanger Pre-Cooling

TC Energy natural gas compressor station in Lachenaie, Canada. Two workers are inspecting the large white pipeline that requires MeeFog cooling for pipeline integrity.

How Fog Cooling Helped TC Energy Keep Gas Temperatures Under Control

Project Profile: MeeFog cools and protects pipeline integrity at Canadian compressor station

MeeFog gauge systems

MeeFog vs. the Competition: A Fogging System Comparison for Data Center Cooling

Blog: Compared to the competition, MeeFog offers higher efficiency, lower maintenance, and proven engineering excellence.

 

Industrial facility with tall smokestacks against a blue sky, featuring structures and piping systems for manufacturing processes.

MeeFog System Boosts Air Compressor Output at Fertilizer Plant

Case Study: Simplot’s Fertilizer Plant uses MeeFog technology to improve its ammonia production process, making it more energy-efficient, reducing costs, and lowering environmental impacts.

View of a rooftop cooling system with large air conditioning units and a crane, set against a clear blue sky.

NYC Financial Institution Prevents Heat-Related Shutdowns with MeeFog System

Case Study: Evaporative pre-cooling to keep from having to shut down the data center during summer heatwaves.

Industrial facility with large metallic pipes extending from a high structure, under a cloudy sky, indicating energy production or processing.

Our Solution: Steam Condenser Pre-cooling

Case Study: A combined cycle power plant uses exhaust heat to make steam, the steam is run through a steam turbine…

Industrial HVAC system with large cooling units, metal pipes, and an orange safety railing under bright sunlight.

AC Condenser Pre-Cooling System Provides 16-Month Return on Investment

Project Profile: A circuit board manufacturer in Mexico installed pre-cooling on two York condensers.