Evaporative Cooling for Arizona State University’s LEED Platinum Certified Research Lab
Project Profile: Explore the MeeFog energy recovery system that delivers 15°F cooling while enhancing sustainability.
Existing Customers Call 626-359-4550 Or Visit Customer Care
Project Profile: Explore the MeeFog energy recovery system that delivers 15°F cooling while enhancing sustainability.
Case Study: Grand Valley State University strategically implemented a cost-effective MeeFog centralized humidification system to ensure optimal energy usage and preserve indoor air quality for its new four-story Business College building.
Case Study: Discover how Valparaiso University Library saves $40,000 annually in energy costs and preserves collections with MeeFog’s high-pressure humidification system.
Case Study: How Aileen S. Andrew Memorial Library implemented an energy-efficient humidification system to combat winter conditions and high humidifying loads.
Case Study: NSF’s transition to innovative MeeFog Humidification Systems resulted in substantial cost savings and improved testing reliability, furthering their mission to safeguard and enhance global human health.
Case Study: Installing a MeeFog humidification system with strategically distributed fog nozzles lines allowed for tight control of humidity levels at U.S. production company.
Case Study: Discover how MeeFog’s high-pressure fogging system improved air quality and reduced energy costs at Grand River Hospital in Ontario.
Case Study: Learn how MeeFog’s high-pressure humidification system optimized humidity control for the Ann Arbor News, leading to annual energy savings of over $140,000 and improved indoor air quality.
Case Study: Providing precise environmental control for the Smithsonian’s 360,000 sqft facility, requiring stringent environmental controls to ensure the preservation of priceless artifacts.