Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

Evaporative Cooling for Arizona State University’s LEED Platinum Certified Research Lab

  • View looking up at towering skyscrapers shrouded in soft clouds against a bright blue sky, creating a dreamy urban atmosphere.
A researcher in a protective suit examines a sample under a microscope in a modern laboratory filled with glassware and equipment.

Arizona, USA

The Arizona State University Biodesign Institute stands as Arizona’s largest infrastructure investment in bioscience-related research. The Institute’s Building C is LEED Platinum certified and utilizes MeeFog’s advanced humidification and cooling system to enhance its sustainability efforts. The MeeFog system has one pump unit feeding three energy recovery coils for indirect evaporative cooling, and is is in sync with ASU’s building control system which turns the system on and off as required to pre-cool in the Exhaust Air Unit. The system requires no mist eliminators, operates with soft water, and effectively reduces temperatures to ensure consistent performance and substantial environmental benefits.

 

Project Conditions:

Location: Arizona, USA
Total Air Flow: 165,000 cfm
Energy Recovery Units: 3

Mee Industries’ Scope of  Work:
Supply of fog pump, staging valves, nozzle manifolds, installation and startup.

Fog System Design:

MeeFog Nozzle Count: 213
Degrees of Cooling: 15°F
Max GPM/HP: 7.2 gpm / 7.5 HP
Stages: 15

Learn More

Want to learn more about how MeeFog systems can enhance your facility’s energy efficiency?

Other Related Blog Articles

Exterior of the Amherst College Science Center featuring a mix of glass and metal, surrounded by lush green lawns and trees under a serene twilight sky.

Energy Efficient MeeFog System Allows Amherst College to Humidify the New Science Center

Case Study: Discover how Amherst College achieved a 73% reduction in energy usage at its new Science......
A group of students sits on stairs in a modern atrium, engaged in discussions and using laptops amidst a busy university atmosphere.

Grand Valley State University (GVSU) – Energy-Efficient Humidification with MeeFog

Project Profile: GVSU uses MeeFog to humidify one air handling unit and six greenhouse zones  ...
Iowa State University's Hach Hall

Iowa State University Builds the First Gold LEED Certified Chemistry Laboratory

Case Study: MeeFog’s fogging system helps ISU’s Hach Hall achieve LEED Gold and reduce energy costs desp...