PetroVietnam Power Achieves 30 MW Boost on Two GT13E2 Turbines

PetroVietnam Power facility with two GE Alstom GT13E2 gas turbines equipped with MeeFog systems

PetroVietnam Power enhanced the performance on two GE Alstom GT13E2 gas turbines with MeeFog. These advanced MeeFog systems provide fog evaporative cooling and wet compression, utilizing skids with sixteen pumps and sixteen stages of fogging each. They deliver a 15 MW power boost, resulting in a total power boost of 30 MW for both units. The improved efficiency and output demonstrate the substantial benefits of MeeFog systems for large-scale power generation.

Project Conditions:

Location: Nhon Trach, Vietnam
Hot day conditions: 32.6 °C / 48% RH with 23.8 °C wet bulb
Elevation: Sea Level
Max power boost per GT: 15 MW
Mee’s scope of work: Supply of fog pump skid, nozzle manifolds, and supervision of installation and commissioning.

Fog System Design:

Cooling Stages: 16 (evaporative cooling and 0.6% wet compression)
Operating Pressure: 2,000 psi
Fog Droplet Size: 12 micron
MeeFog™ Nozzle Count: 2,048
Nozzle Flow Rate: 0.17 lpm per nozzle
Max. Water Flow: 348.2 lpm
Max. Power Requirement: 160 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

Gas Turbine & Heat Exchanger Cooling

Watson Cogeneration Boosts Output by 10 MW with MeeFog Wet Compression System

Case Study: Learn how Watson Cogeneration increased power production by 10 MW using MeeFog’s advanced wet comp...

MeeFog Adds 64MW of Power Augmentation to Mexican Power Plant

Case Study: To capitalize on new market opportunities arising from energy regulations in Mexico, the Tuxpan III......

Boost of 28 MW on two Siemens SGT-5000FD2 GTs Using Wet Compression

Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of......