Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

FAQs

What are the energy savings of using MeeFog in cleanrooms?

Our cleanroom humidity control systems offer significant energy savings compared to their traditional gas-fired counterparts. For instance, at Danfoss Power Electronics, annual humidification costs dropped from $8,000 in gas and electricity to just $750 in electricity. That’s more than a 90% reduction in energy costs, while maintaining superior performance.

View Details

How does MeeFog improve performance compared to gas-fired humidification systems?

Traditional gas-fired steam systems often consume excessive energy and struggle to maintain even cleanroom humidity. In contrast, our central humidification system uses no natural gas, providing consistent humidity levels throughout the facility.

For instance, at Danfoss Power Electronics in Illinois, one MeeFog cleanroom humidifier replaced an inefficient gas-fired system, eliminating humidity fluctuations while dramatically reducing energy use.

View Details

Why is humidification important in cleanrooms and electronics manufacturing?

In electronics manufacturing, controlling cleanroom humidity is critical to prevent electrostatic discharge (ESD) that can damage sensitive components. Maintaining stable humidity levels helps follow ISO cleanroom standards, prevents contamination, and protects product quality.

Our cleanroom humidifier systems offer precise and reliable humidity control, keeping temperature and humidity settings within a tight range of ±1% RH.

View Details

Project Profiles

Gas Turbine Fogging and Heat Exchanger Cooling

Mitsubishi Power

Japanese Power Company Generates 123 MW Boost – 6 x MHPS 501J GTs

Victoria Texas 501F Generates 24 MW Boost – 1 x M501F GT

M701F Gas Turbine Gains 60 MW Total Power Boost

ABB

Midland Cogen 144 Total MW Boost – 12 x ABB 11NM GTs

Alstom

Midlothian & Hays 124 MW Boost – 10 x Alstom 24 GTs

JFE Steel Japan gain 38 MW – 1 x GE/Alstom GT-26 

Evaporative Cooling & Wet Compression Boosts Power Output by 30 MW

Siemens

Vietnam Electricty Gains 39.6 MW Boost – 2 x Siemens V94.2 GTs

Boost of 28 MW on two Siemens SGT-5000FD2 GTs Using Wet Compression

Southwestern US Wet Compression on two 501FD2 GTs

20MW Boost on 2 Siemens V64.3

General Electric | GE Vernova | GE Aerospace

PetroVietnam Generates 30 MW Boost – 2 x GT13E2 GTs

Total 48 MW Boost in Australia – 12 x GE 5371PA GTs

US Power Plant 20 MW Boost – 2 GE 7F.03 GTs

14.5 MW Boost with MeeFog Low-Maintenance Fogging System in Wisconsin 

Thai Cogeneration Company Gains 8.6 MW on 2 GE 6561B GTs

APR Energy 16 MW Boost – 4 x FT8 Mobile Pack GTs

Linden Cogen 6 MW Boost – 1 x GE 7EA GT

OEM Systems Replaced with MeeFog – 2 x GE 7FB.04 GTs

Proctor & Gamble 3 MW Boost – 1 x LM6000 GT

Pitchess Detention Center Cogen Gains 8.6 MW – 1 x LM-2500 GT

Texas Plant Gains 2.6 MW – 1 x LM-2500 GT

Rolls Royce

Offshore Re-Injection Well Gains 1 MW on RB211G

 

Evaporative Cooling

Certified Research Lab Evaporative Cooling for LEED Platinum

View Details

Case Studies

Gas Turbine Fogging:

GT Fog Cooling Case Study at Petro-China Compressor Station

GT Power Augmentation Case Study – Mexican Power Plant (64 MW)

28 MW Boost on two Siemens SGT-5000FD2 GTs Using Wet Compression

20 MW of Power Recovery at Load-Following Power Plant

10 MW Output Boost at Watson Cogeneration 

Refinery Fog Cooling Case Study – Southern California (5 MW, 30 °F Cooling)

Cogeneration Boost Case Study – Las Vegas Cogen (5 MW Output Gain)

4 MW Gains by Adding Overspray to Existing Fog System

Midland Cogeneration Venture Achieves Rapid ROI Across 12 Turbines

Data Center Pre-Cooling:

Data Center Pre‑Cooling Case Study – NYC Financial Institution (Avoids Shutdowns)

NCAR Multi-Million-Dollar Supercomputer Protected with MeeFog 

Meta Hyperscale Data Center Achieves 1.06 PUE with MeeFog Data Center Cooling

Data Center Humidification Case Study – OneNeck IT Solutions, Wisconsin

Commercial & Industrial Humidification:

Humidification ROI Case Study – Housing & Urban Development Upgrade

Electronics Manufacturing Humidification Case Study – Danfoss Power Electronics, Illinois

$26k Annual Savings and Enhanced Air Quality at Upper Peninsula Medical Center

Humidification Case Study – Grand River Hospital, Ontario (Air Quality & Energy Efficiency)

Industrial Humidification Case Study – Alliant Energy Corp (Efficiency Boost)

57% Energy Savings for NC Museum of Art with MeeFog Adiabatic Humidification System

MOCA Los Angeles Preserves Art with MeeFog Humidification Upgrade

Smithsonian Lowers Energy Costs with MeeFog Humidification System

Milwaukee Print Facility Saves $75K/Year Replacing Gas-to-Steam Humidifiers

Grand Valley University Achieves 38% Lower Energy Usage than Baseline ASHRAE Standards

Lower Energy Costs For Dixie Cup Manufacturing with MeeFog

Winery Humidification Case Study: Jamieson Ranch Vineyards, Napa Valley

Winery Barrel Room Humidification Case Study – Silver Oak Cellars

Laboratory Humidification Case Study – Virginia DCLS Facility, Richmond

Army Research Lab Saves $127k with MeeFog Humidification

Iowa State University Chemistry Laboratory Cuts Energy Use in Half

Steam Turbine Pre‑Cooling Case Study – Power Plant (Backpressure Reduction)

Ultra-Pure Water Treatment:

Magnets USA Optimizes Production Process with Humidification and Water Treatment from MeeFog

Power Plant in the Middle East Achieves Ultra-Pure Water (< 0.1 µS/cm)

Special Effects Fog Sculpture Case Study – Exploratorium, San Francisco (Fog Bridge Installation)

View Details