Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

FAQs

Does wet compression affect turbine lifespan?

When correctly implemented, wet compression in a gas turbine operates safely without shortening equipment life.

View Details

What kind of power boost can I expect?

Injecting a 2% air mass flow as wet compression spray will boost gas turbine output by as much as 10%. The power increase is greater for turbines with a higher pressure ratio.

View Details

How does wet compression improve turbine performance?

It reduces compressor work, freeing more shaft power for useful output, and cools the compressor discharge so additional fuel can be burned and further increasing turbine power.

View Details

What is gas turbine wet compression?

Wet compression is a gas turbine power augmentation method that injects atomized water (fog) into the compressor. The fog evaporates giving an intercooling effect, which reduces the work of compression and increases available power, further boosted by allowing more fuel to be burned due to cooler discharge air.

View Details

What sort of guarantee or warranty does MeeFog provide for its pre‑cooling systems?

We guarantee the amount of cooling a system will produce on a hot day. MeeFog systems have a 12-month warranty. Longer warranty terms are available on request.

View Details

Can the pre-cooling system be used under all weather conditions, including high heat or very humid days?

MeeFog pre-cooling systems can be used whenever the temperature is above freezing. It is usually possible to cool by at least 10°F (5.5°C) even on humid afternoons in a tropical climate.

View Details

Are there any case studies or examples of performance improvements in similar indirect evaporative cooling applications?

Yes, we’ve documented several indirect evaporative cooling projects showing measurable performance gains on steam condensers, AC condensers, and other systems. 

View Details

What are typical lead times and installation requirements (power, plumbing, structural supports)?

To install a pre-cooling system for heat exchangers, typical lead times are about 12 weeks for smaller projects and up to 24 weeks for larger ones. MeeFog pump skids arrive fully assembled, with fog nozzles installed and factory-tested.

Nozzle lines usually ship in 20-foot sections. Installation involves bolting the pump skid to a foundation, then connecting the feedlines and nozzle lines. MeeFog supplies all required drawings and a technical advisor to support the installation process.

View Details

What are the materials and construction details (e.g., stainless steel, nozzle design)?

Fog nozzles, fog nozzle lines, feedlines, and pumps are all stainless steel, which provides long life and requires minimal maintenance.

View Details