What are typical lead times and installation requirements (power, plumbing, structural supports)?
To install a pre-cooling system for heat exchangers, typical lead times are about 12 weeks for smaller projects and up to 24 weeks for larger ones. MeeFog pump skids arrive fully assembled, with fog nozzles installed and factory-tested.
Nozzle lines usually ship in 20-foot sections. Installation involves bolting the pump skid to a foundation, then connecting the feedlines and nozzle lines. MeeFog supplies all required drawings and a technical advisor to support the installation process.