Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

Come see us at GTF Expo in China!   July 10 – 12, 2024

Gas Turbine Inlet Air Cooling

Six MHPS 501J Gas Turbines Achieve 123 MW Boost in Japan

Project Profile: Mee Industries installed evaporative cooling systems to augment power production on six of their MHPS 501J …

How a Southern California Refinery Mastered Power Generation and Cooling with MeeFog Technology

Case Study: Discover how we efficiently increased power generation while adhering to strict emissions regulations at a major oil refinery in the Los Angeles area.

Slashing Chiller Costs With Inlet Fog in Nevada

Case Study: In response to challenges posed by Las Vegas Nevada’s hot and dry climate, a GE LM6000-based peaker plant faces difficulties in maintaining optimal cooling during peak summer temperatures.

MeeFog System Enhances Power, Cuts Fuel Usage, and Reduces Emissions at Chinese Compressor Station

Case Study: Installing a MeeFog system on a GE LM2500 turbocompressor helped PetroChina enhance natural gas output, meet demand, and reduce emissions. Here’s how.

Inlet Cooling & Wet Compression Boosts Power Output by 20 MW

Project Profile: MeeFog systems were installed in 2000 on two Siemans V64.3 gas turbines offering both inlet cooling and wet compression.

Inlet Cooling Boosts Power Output by 30 MW

Project Profile: In 2004, Mee Industries installed inlet air cooling systems on two Alstom GT26 gas turbines at a Thailand power plant to boost output cost-effectively.

MeeFog Skid Upgrade Boosts Power Output by 30 MW

Project Profile: Located in Chihuahua, Northwest Mexico, at an altitude of 1,260 meters, this power plant initially installed MeeFog systems in 2006.

Pitchess Detention Center Cogen Gains 8.6 MW with One LM-2500 GT

Project Profile: Correctional facility’s cogeneration plant in California improved efficiency and reduced summer heat impact with a MeeFog system, cooling inlet air and enhancing turbine performance.

U.S. Embassy Cools Diesel Generators with MeeFog

Project Profile: The U.S. Embassy in Kabul, Afghanistan faced the challenge of cooling two large rooms housing diesel generators critical for embassy operations.