Texas Plant Gains 2.6 MW with LM-2500 GT

This MeeFog installation in 1997 was on an General Electric LM2500 that drives air compressors at a gas plant. It was designed for evaporative cooling and overspray (wet compression). According to the operator, the system has been used every summer for over 23 years with no negative impact to the gas turbine.

Project Conditions:

Location: Hawkins, Texas
Hot day conditions: 100 °F and 32% RH (75 °F wet bulb)
Model: LM-2500 Gas Turbine
Elevation: 410 feet
Mee’s scope of work: Design, build, supervise, installation
Max power boost per GT: 2.6 MW

Fog System Design:

Cooling Stages: 3
Operating Pressure: 2,000 psi
Fog Droplet Size: 19 micron (DV 90)
MeeFog™ Nozzle Count: 225
Nozzle Flow Rate: 0.045 gpm per nozzle
Max. Water Flow: 10.2 gpm
Max. Power Requirement: 15 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

Gas Turbine & Heat Exchanger Cooling

Watson Cogeneration Boosts Output by 10 MW with MeeFog Wet Compression System

Case Study: Learn how Watson Cogeneration increased power production by 10 MW using MeeFog’s advanced wet comp...

MeeFog Adds 64MW of Power Augmentation to Mexican Power Plant

Case Study: To capitalize on new market opportunities arising from energy regulations in Mexico, the Tuxpan III......

Boost of 28 MW on two Siemens SGT-5000FD2 GTs Using Wet Compression

Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of......