One GE/Alstom GT-26 Gains 38 MW for JFE Steel Japan

JFE Steel Corporation in Chiba, Japan

JFE Steel Corporation, a prominent power producer in Chiba, Japan, initially installed a MeeFog System on their GE/Alstom GT-26 gas turbine in 2003. This system was designed to provide evaporative cooling and a small amount of wet compression. In 2016, the company upgraded to a larger, more efficient MeeFog System, enhancing its capability and significantly boosting power output. The flow rate increased significantly from 42 gpm (160 lpm) to 134 gpm (506 lpm). The system is continues to provide evaporative cooling and now offers 1% of the air mass flow as wet compression spray. The new system provides twenty-four stages of fogging, and produces a 38 MW power boost.

Project Conditions:

Location: Chiba, Japan
Hot day conditions: 35° C & 40% relative humidity
Elevation: 10 meters above sea level
Max power boost: 38 MW
Mee’s scope of work: Supply of fog pump skids, nozzle manifolds, and supervision of
installation and commissioning

Fog System Design:

Fogging stages: 24
Operating pressure: 2,000 psi
Fog droplet size: 12 microns
Nozzle flow rate: 0.045 gpm (0.17 lpm)
MeeFog nozzle count: 2,976
Pump skid power: 240 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

MeeFog Boosts Power Output by 15% at Sahara Power Station | APR Energy Case Study

Case Study: How MeeFog improved gas turbine efficiency for General Electric Company of Libya (GECOL) —15% power......

Instant 1 MW Power Boost for Offshore Gas Re-Injection Well

Project Profile: A strategic upgrade on a Rolls Royce RB211 marine gas turbine resulted in a substantial......

Watson Cogeneration Boosts Output by 10 MW with MeeFog Wet Compression System

Case Study: Learn how Watson Cogeneration increased power production by 10 MW using MeeFog’s advanced wet comp...