Four FT8 Mobile Packs Power APR Energy to 16 MW Output

Optimizing Power Recovery in Sahara's Extreme Climate: FT8 Mobile Packs and MeeFog

APR leased their FT8 Mobile Packs to General Electric Company of Libya. These provided a quick power solution to a remote location in the Sahara, about one day’s drive from the urban centers along the Mediterranean coast. Due to the extreme desert climate, MeeFog Systems were necessary to recover power that otherwise would be lost.

Project Conditions:

Location: Samnu Power Plant, Libya
Hot day conditions: 113 °F (45 °C)
Cooling Capacity: 49 °F (27 °C)
Elevation: 417 meters
Max power boost per GT: 4 MW
Mee’s scope of work: Supply of fog pump
skid, nozzle manifolds, and supervision
of installation and commissioning

Fog System Design:

Cooling Stages: 14
Operating Pressure: 2,000 psi
Fog Droplet Size: 8 microns (SMD)
MeeFog™ Nozzle Count: 336
Nozzle Flow Rate: 0.045 gpm per nozzle
Max. Water Flow: 15.2 gpm
Max. Power Requirement: 27 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

How a Southern California Refinery Mastered Power Generation and Cooling with MeeFog Technology

Case Study: Discover how we efficiently increased power generation while adhering to strict emissions regulations at...

Slashing Chiller Costs With Inlet Fog in Nevada

Case Study: In response to challenges posed by Las Vegas Nevada’s hot and dry climate, a GE......

MeeFog System Enhances Power, Cuts Fuel Usage, and Reduces Emissions at Chinese Compressor Station

Case Study: Installing a MeeFog system on a GE LM2500 turbocompressor helped PetroChina enhance natural gas output,....