Vietnam’s Largest Power Plant Gains 60 MWs with MeeFog Cooling System
Project Profile: Learn about the custom-engineered solution that enhances gas turbine performance under extreme conditions.
Existing Customers Call 626-359-4550 Or Visit Customer Care
Project Profile: Learn about the custom-engineered solution that enhances gas turbine performance under extreme conditions.
Project Profile: Learn about our custom pump rack solution with dual pumps and automated controls for optimized performance.
Project Profile: Discover how a Virginia microchip manufacturer improved clean room humidity control and mitigated electrostatic discharge with a custom-engineered MeeFog system.
Case Study: Faced with the challenge of maintaining optimal power output as equipment aged and temperatures rose, the plant sought a cost-effective solution to recover lost capacity without expensive upgrades.
Case Study: Discover how Mee Industries’ compact Dual-Pass RO/EDI skids use reverse osmosis and electro-deionization to provide continuous and chemical-free regeneration of ion exchange resins despite water quality challenges at a Middle Eastern power plant.
Project Profile: Explore the MeeFog energy recovery system that delivers 15°F cooling while enhancing sustainability.
Case Study: Grand Valley State University strategically implemented a cost-effective MeeFog centralized humidification system to ensure optimal energy usage and preserve indoor air quality for its new four-story Business College building.
Case Study: See how MeeFog Industries transformed Amazon’s Seattle headquarters into an urban cloud forest situated in the iconic Amazon Spheres.
Case Study: Discover how Valparaiso University Library saves $40,000 annually in energy costs and preserves collections with MeeFog’s high-pressure humidification system.