Kentucky College Installs MeeFog Humidification, Exhaust Cooling Systems and Water Treatment

Humidification for 4 Air Handlers and evaporative cooling for 4 Exhaust Units:

  • This system is designed with redundant pump units for the Air Handlers.
  • All units are on individual stainless steel pump racks, with VFD, PLC with user interface, heat exchanger for part load cooling, and full instrumentation.

Project Conditions:

Location: Lexington, Kentucky
Entering air conditions: 86 °F db / 50° F wb
Leaving air conditions: 55° F db / 50° F wb

Mee’s scope of work: Supply of reverse osmosis system, fog pump skid, staging valves, nozzle manifolds, and mist eliminators. Supervision of installation and startup.

Humidification System Design:

MeeFog nozzle count: 224
Humidification capacity: 3,584 #/hr
Total horse power: 1 x 7.5 hp

 

 

Exhaust Cooling System Design:

MeeFog nozzle count: 281
Cooling capacity: 12° F
Total horse power: 1 x 7.5 hp +1×5 hp

Humidification Equipment Schedule

Nozzles mounted in the air handler

Wet section before the cooling coil, any moisture not absorbed in the section is collected on a droplet filter and drained.

Other Related Blog Articles

Energy Efficient MeeFog System Allows Amherst College to Humidify the New Science Center

Humidification for AHU’s 1-4 & 6. Evaporative cooling for HRU’s 1-4. Consisting of one pump rack with......