Mee Industries Inc.
About Us

Top Div

Sitemap

Top Div
 
Gas Turbine Button Humidification Button In-Plant Button Special Effects Button Agricultral Button
 
    Home
 
    Gas Turbine
Power Generation
Oil, Gas, Petrochemical
Offshore Operations
Arrow 40MeeFog Concept
Arrow 40Products & Solutions
Arrow 40R&D
References
Exhibits + Events
FAQ
 
    Request A Brochure
    Request A Quotation
Loc Upper Bar
For more information, please contact Mee Industries Inc.
International:
+1.626.359.4550
Phone:
1.800.732.5364
626.359.4550
Fax:
626.359.4660
E-mail:
info@meefog.com
Mailing Address:
204 W. Pomona Avenue,
Monrovia, California 91016
Loc Lo Bar

GAS TURBINE INLET AIR COOLING FOR POWER GENERATION


 
  Increase output by 20% or more
  Improve heat rate up to 5%.
  Reduce NOx emissions up to 30%.
  Up to 100% evaporation efficiency.
  Easy retrofit and fast installation.
  Fog inter-cooling gives additional boost
  Reduce Fuel Consumption

MeeFog - The Right Choice for Boosting Gas Turbine Output

Electricity is the fastest growing form of energy consumption, not only in developing countries but also in the more mature economies of the world. This fact presents a challenge to operators to improve output to meet the demands of growth.

Mee Industries is recognized as the world's leader for gas turbine power augmentation with inlet air fogging. Many large electric power utilities have adopted Mee Fog systems for their entire gas turbine fleet at exisitng and new power generating sites. For example, in 1998, Tennessee Valley Authority, installed MeeFog systems on its fleet of 48 gas turbines, and again in 2001 they added fog to 16 new GE 7EA turbines. Florida Power & Light has installed 34 fog systems on its fleet of GE 7FA turbines.

Fog cooling is a highly cost-effective way to improve the output of existing plants and inlet fogging can make a big difference in the economics of a new plant. For example the cost per kW of a new plant can be reduced by as much as 15% simply by adding a Mee Fog system to the project.

Mee Industries uses a packaged-engineering approach that makes it possible to deliver and install cost effective power-boosting fog systems with a typical project lead time of 12 weeks. Fog systems can be installed on existing turbines with as little as 24 hours of outage time.

With over 700 installations, and more than 30 years experience with high-pressure fogging, Mee Industries is the preferred supplier for major Utilities and Independent Power Producers (IPPs) around the world.

 
      Related Links
Brochure:
Gas Turbine Inlet Air Fogging.
Download PDF

White Paper:
A Comparative Guide to Inlet Air Cooling Technologies.
Download PDF

Articles:
Portland General Electric Co.(PGE) – PGE reports an output increase of 16 MW, a 10 percent improvement.
Download PDF
Gas TurbineLo DivHVACLo DivIn-PlantLo DivSpecial EffectsLo DivAgriculture  
Copyright Information