A MeeFog™ Humidification system uses substantially less energy than other humidification technologies including compressed air, ultra-sonic and steam systems.

Humidification In Hospital And Medical Centers Rely On MeeFog Adiabatic, Direct_Pressure, High Pressure Fog, Evaporative Cooling Systems To Control Humidity Levels In Order To Maintain A Healthy Environment
Health issues associated with low RH and additive chemicals entering the air from steam humidification systems are only a few reasons why you should upgrade with MeeFog.
While most people consider proper humidification a matter of comfort, it also is a key factor in maintaining health. Discomforts such as sore eyes and throat, nasal stuffiness, colds, coughs and dry skin are associated with low Relative Humidity (RH).

Mee Industries helps combat low relative humidity health issues in hospitals and medical facilities by introducing pure water humidification into the Air Handling Unit (AHU). Electronic controls along with a series of high pressure pumps, variable frequency drives, and staged nozzles ensure humidity is maintained between a range of 30% to 50% as recommended by the CDC.

In addition to low RH, contaminants such as airborne particles and additive chemicals entering the air stream from steam humidification systems are only a few reasons why you should upgrade with a cost-saving leader in humidification.

Pure water adiabatic humidification systems by MeeFog have the lowest running costs in the industry. The energy consumed by pure water fog is only a small fraction of that required by other technologies.

MeeFog™ systems do not require compressed air or steam. Direct pressure means few moving parts (none in the air handler). The energy consumed is a small fraction of other technologies, such as compressed air, ultra-sonic, or steam systems.

Most importantly, return on investment for installing a MeeFog™ System can be realized in less than one year.

Want proof?

We'll gladly supply a detailed payback analysis report for your Hospital or Medical Center including:
  • Installed MeeFog™ system cost
  • Predicted Process Gains Per Year

MeeFog™ System Benefits:

  • Reduces electrostatic shock
  • High quality, corrosion resistant system components
  • Low energy consumption
  • Precise humidity level control
  • Easy to service and maintain
  • Ultra-fine fog droplets
  • Stainless steel construction
  • Flexible and easy to retrofit
  • Easy to specify
  • Guaranteed results!

Featured Case Study

Upper Peninsula, Medical Center, Marquette, Michigan

New Addition, Engineer: Integrated Design, Marquette, Michigan

Mee Fog Humidifier Installation

Mee Fog High Pressure Humidification System For Three Air Handlers.

Benefits:

  • Reduced Energy Consumption
  • Lower Maintenance Costs
  • Improved IAQ
  • $26,000 Savings Per Year

The Upper Peninsula Medical Center is located in the growing and peaceful City of Marquette, which is located on the Southern shore of beautiful Lake Superior in Michigan's Upper Peninsula.

The Marquette Medical-Dental Center was established in 1965, originally housing 18 physicians. Today, with over four (4) major expansions over the years, the Upper Peninsula Medical Center provides private offices for over 120 physicians and other health care professionals.

Over one half million patients visit the Upper Peninsula Medical Center annually. Because of the extreme winter conditions and high humidifying loads, Steve Boettcher of Integrated Design knew they needed an energy efficient humidification system. Steve called on MeeFog for input in designing the energy efficient humidification system.

The environment of the newest addition to the Medical Center is controlled by three air handlers with a total of 69,000 cfm and a humidifier capacity of 500#/hr. The load is matched by using staging solenoids that bring on nozzle headers in various combinations. Excess moisture that is not absorbed into the air stream is collected on droplet filters and drained away. The total electrical load for this system is 2.25 kW. A complete Reverse Osmosis system to remove unwanted minerals from the water was also installed as part of the system.

Annual energy savings, as compared to gas fired steam generating humidifiers, is in excess of $26,000, with a further reduction of $3,000 in annual maintenance costs.

The building engineer is excited about the reduced maintenance requirements of the MeeFog system and is looking forward to many low maintenance years of humidifying the newest addition to the Upper Peninsula Medical Center.

Learn More

Showcase

The MeeFog™ Rack

The highly reliable, robustly engineered MeeFog™ rack incorporates a system of high-pressure pumps, which pressurize demineralized water. This ultra-clean water flows through a network of stainless steel tubes and then through the revolutionary MeeFog™ nozzles. Each self-contained MeeFog™ rack includes a programmable logic controller (PLC) control system that allows the system to operate safely in automatic mode.

Mee Industries' unique turnkey installations are made possible by our proprietary high-pressure MeeFog™ racks, allowing the completion of installations with as little as 1-2 day outages.

Request More Information
Request a Quote

Brochure(s)

Whitepaper(s)

Article(s)

Related Links

Humidification Customers

  • Acadia University
  • Alamance Regional Medical Center
  • Boston Scientific
  • Brookfield Zoo
  • Connecticut Post News
  • Correctional Forensic Center
  • Dalhousie University
  • Fermilab Feynman Computing Center
  • Grand River Hospital
  • Grand Valley State University
  • Halifax Development Center
  • Inchon Airport, Korea
  • International Monetary Fund
  • James Paton Memorial Hospital
  • Meridia Hospital
  • Nellis Air Force Base
  • New Highland View Regional Hospital
  • New York Daily News
  • Robins Air Force Base
  • Sheraton Casino
  • Siouxland Cancer Center
  • South Shore Regional Hospital
  • Texas Instruments
  • Trent University
  • U.S. National Archives
  • United States Postal Service Headquarters
  • Xwave Office Tower