Government Buildings

A MeeFog™ Humidification system uses substantially less energy than other humidification technologies including compressed air, ultra-sonic and steam systems.

MeeFog Humidification Systems For Government Buildings Including; IMF, Air Force Bases (AFB), Laboratories, Postal Processing Centers, Federal Hospitals (VA), Courts And Correction Centers, Aerospace, and Federal Computer Centers Benefit From Using MeeFog Adiabatic, Direct-Pressure, High-Pressure Fog, Evaporative Humidification Control Mee Industries has supplied humidification systems for government buildings including; IMF, Air Force Bases (AFB), Laboratories, Postal Processing Centers, Federal Hospitals (VA), Courts & Correction Centers, Aerospace, and Federal Computer Centers.

One project in particular, NSF, is a lab responsible for public health and safety located in Ann Arbor, MI. NSF called upon Mee Industries to provide humidity control they specified in the existing air handling units (AHU's).

With MeeFog installed, the annual energy savings (as compared to gas fired steam humidifiers) was in excess of $75,000 with a annual reduction in maintenance cost of $18,000.

Savings in running costs and low maintenance routines means that a MeeFog system will typically pay for itself within one year.

Want proof?

We'll gladly supply a detailed payback analysis report for your government building including:
  • Installed MeeFog™ system cost
  • Predicted Process Gains Per Year

MeeFog™ System Benefits:

  • Reduces electrostatic shock
  • Suspend airborne dust
  • High quality, corrosion resistant system components
  • Low energy consumption
  • Cools and conditions
  • Easy to service and maintain
  • Ultra-fine fog droplets
  • Stainless steel construction
  • Flexible and easy to retrofit
  • Easy to specify
  • Guaranteed results!

Showcase

The MeeFog™ Rack

The highly reliable, robustly engineered MeeFog™ rack incorporates a system of high-pressure pumps, which pressurize demineralized water. This ultra-clean water flows through a network of stainless steel tubes and then through the revolutionary MeeFog™ nozzles. Each self-contained MeeFog™ rack includes a programmable logic controller (PLC) control system that allows the system to operate safely in automatic mode.

Mee Industries' unique turnkey installations are made possible by our proprietary high-pressure MeeFog™ racks, allowing the completion of installations with as little as 1-2 day outages.

Request More Information
Request a Quote

Brochure(s)

Whitepaper(s)

Articles(s)

Related Links

Humidification Customers

  • Acadia University
  • Alamance Regional Medical Center
  • Boston Scientific
  • Brookfield Zoo
  • Connecticut Post News
  • Correctional Forensic Center
  • Dalhousie University
  • Fermilab Feynman Computing Center
  • Grand River Hospital
  • Grand Valley State University
  • Halifax Development Center
  • Inchon Airport, Korea
  • International Monetary Fund
  • James Paton Memorial Hospital
  • Meridia Hospital
  • Nellis Air Force Base
  • New Highland View Regional Hospital
  • New York Daily News
  • Robins Air Force Base
  • Sheraton Casino
  • Siouxland Cancer Center
  • South Shore Regional Hospital
  • Texas Instruments
  • Trent University
  • U.S. National Archives
  • United States Postal Service Headquarters
  • Xwave Office Tower